Double Girder Railway Bridge Factory Directly Supply 200 Ton Girder Launching Gantry Crane

Product Details
Customization: Available
Certification: CE, ISO9001
Condition: New
Manufacturer/Factory, Trading Company
Diamond Member Since 2019

Suppliers with verified business licenses

Management System Certification
ISO 9001, ISO 9000, ISO 14001, ISO 14000, OHSAS/ OHSMS 18001
  • Double Girder Railway Bridge Factory Directly Supply 200 Ton Girder Launching Gantry Crane
  • Double Girder Railway Bridge Factory Directly Supply 200 Ton Girder Launching Gantry Crane
  • Double Girder Railway Bridge Factory Directly Supply 200 Ton Girder Launching Gantry Crane
  • Double Girder Railway Bridge Factory Directly Supply 200 Ton Girder Launching Gantry Crane
  • Double Girder Railway Bridge Factory Directly Supply 200 Ton Girder Launching Gantry Crane
  • Double Girder Railway Bridge Factory Directly Supply 200 Ton Girder Launching Gantry Crane
Find Similar Products

Basic Info.

Model NO.
BGEM
Maximum Lifting Height
4-5m
Maximum Lifting Weight
>200t
Main Girder Form
Double Girder
Type
Ordinary
Lifting Capacity (T)
200ton
Applicable Span (M)
≤55
Applicable Skew Bridge Angle
0-450
Trolley Lifting Speed (M/Min)
0.8
Tolley Longitudinal Moving Speed (M/Min)
4.25
Cart Longitudinal Moving Speed (M/Min)
4.25
Cart Transverse Moving Speed (M/Min)
2.45
Transportation Capacity (T)
100*2
Speed of Bridge Transport Vehicle (M/Min
8.5
Return Speed (M/Min)
17
Transport Package
Container Loading for Better Cost Saving
Specification
40′HQ or bulk cargo ship
Trademark
Nucrane
Origin
Henan Changyuan City
Production Capacity
100sets/Month

Product Description

Double Girder Railway Bridge factory directly supply 200 ton girder launching gantry crane
 
Double Girder Railway Bridge Factory Directly Supply 200 Ton Girder Launching Gantry Crane
Bridge girder erection machine merges an adaptation of a wide range of work, excellent performance, convenient operation, safety structure into a single whole. It has the steel structure of rail type precast beam hoisting rack equipment. This product can be used not only in plain construction, but also to meet the construction of mountain highway slope, small radius curved bridge, skew bridge and tunnel bridge requirements.
 
The bridge girder erection machine consists of main girder, crane, front legs, rear legs, front leg cylinder, rear leg cylinder and the transverse connection of front, middle, rear legs. The control part is composed of hydraulic system and electric control system. The bridge girder erection machine is characterized by reasonable compact structure and convenient installation, the main standard girder is connected by pin connection. The double girder structure is connected between the two frame girders by welded pipe.
Double Girder Railway Bridge Factory Directly Supply 200 Ton Girder Launching Gantry Crane
The bridge girder erection machine not only can meet the standard set up, but also it can meet the cross curve erection, variable span erection, span continuous beam, composite beam, continuous steel etc. In addition to bridge erection, simply supported girder erection and point lifting, it is characterized by good stability, high efficiency, safety and reliability, variable span convenient adjustment and convenient operation and etc.
Double Girder Railway Bridge Factory Directly Supply 200 Ton Girder Launching Gantry Crane
Double Girder Railway Bridge Factory Directly Supply 200 Ton Girder Launching Gantry Crane

Technical parameters of girder Launcher crane:
 
 model  BGEM50/200 BGEM 40/160 BGEM 40/160 BGEM 35/100 BGEM 30/100
Lifting capacity
(t)
200 160 120 100 100
applicable span
(m)
≤55 ≤50 ≤40 ≤35 ≤30
applicable skew bridge angle 0-450 0-450 0-450 0-450 0-450
trolley lifting speed
(m/min)
0.8 0.8 0.8 1.27 0.8
tolley longitudinal moving speed
(m/min)
4.25 4.25 4.25 4.25 4.25
cart longitudinal moving speed
(m/min)    
4.25 4.25 4.25 4.25 4.25
cart transverse moving speed
(m/min)
2.45 2.45 2.45 2.45 2.45
transportation capacity
(t)
100X2 80 X2 60X2 50X2 50X2
speed of bridge transport vehicle
(m/min)
8.5 8.5 8.5 8.5 8.5
return speed
(m/min)
17 17 17 17 17
Double Girder Railway Bridge Factory Directly Supply 200 Ton Girder Launching Gantry CraneDouble Girder Railway Bridge Factory Directly Supply 200 Ton Girder Launching Gantry Crane
Safety Features
Safety is the most important issue for cranes.To ensure the safety,the following safety devices are equipped in BL crane.
Crane traveling limit switch. 
Overload protection device. 
 Lifting height limit device. 
 Voltage lower protection function .
 Phase sequence protection function. 
 Emergency stop function. 
 Rain cover for outside hoist, driving units, electric cubicle. 
 Warining indicator : flashing nights and warning sounds. 
 Wire-less infra-detector for anti-collusion.

 
Packing/Delivery Adevices:
1
 
Crane Beam & Main Equipment: Packaged by color strip woven plastic cloth for abrasion reduce and
moisture-proof.
2 Crane Kit & Electric Accessories: Export standard high quality plywood case for reduce distortion.
3
 
 
Loading & Delivery Option: Prefered to choose container loading for better cost saving. Oversize beams 
and equipment can be cut for container loading as suitable size crane products. Bulk cargo shipment will be
used when container loading not available.
4 Loading Port: Qingdao Port is prefered, Tianjin Port, Shanghai Port etc. available on your demand.
5 Delivery Time: Lead time 30-45days, port time 5 days, estimate time of arraival (ETA) to Xxxxxx Port 35-50 working days.
Double Girder Railway Bridge Factory Directly Supply 200 Ton Girder Launching Gantry Crane
FAQ

1. What's the information should I provide when inquiry about the bridge launching tube beam launcher crane?

a.we need the Bridge Drawing, the Maximum longitudinal slope and the Maximum Transverse slope.
b.The Girder/beam drawing.


2. How many Personnel and equipment to assemble launching gantry in the worksite we need?
Personnel: 8 to 10 workers equipment
Truck crane > 50 t : 2 sets
Φ19.5 steel wire rope 8 m: 4 ropes
Sleepers: several
Electric welding machine: 1 set
Oxygen, acetylene: 1 set
Hammer(12 pound and 8 pound): 1 set for each
Wrench and pincher: several 
Gradienter: 1 set


3. What are inspection standard for load test of bridge launching tube beam launcher crane?
Dynamic load test: 1.1 times rated load.
Static load test: 1.25 times rated load.


4. How to make highway bridge concrete girders?
Highway Bridge concrete girders could be made by 4 methods:
a. Full span prefabrication.
b. Segment girder prefabrication.
c. Full span cast-in-place girder.
d. Segment cast-in-situ.


5. How about maintenance of bridge launching tube beam launcher crane?
a. Lubricating:Working performance and service life of all mechanisms of crane depend on lubricating to a big extent.
b. Steel wire rope:Fracture of wire has to be specially noticed. A new steel wire rope has to be changed immediately with the condition of broken wire, broken strands and wear loss to scrapping standard.
c. Spreader: The spreader has to be checked regularly.
d. Pulley block:Mainly check rope race wearing condition, check whether wheel flange is cracked and whether pulley could get stuck in the axle or not.
e. Wheels:Regularly check wheel flange and tread, a new wheel has to be immediately replaced as crack part or wearing in wheel flange reaches 10% of wheel thickness;Re-polishing has to be done as diameters between two driving wheels on tread differs more than D/600, or there are severe scar on the tread.
f. Brake: Check one time per shift; The brake should be in accurate movement, and pins do not allow to be stuck. Brake shoes shall fit brake wheels correctly; the brake shoes interval shall be equal to open them.



 

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier