(QD model) Heavy Duty Double Girder Bridge Crane
QD electric double-girder bridge crane with hook is the widely used hoisting machinery. It is mainly comprised of box-shape bridge, crane crab,trolley traveling mechanism and electric control system. The load handling device is the hook.
On the girder laid for crane to transversely move. The girder is weld with the box-shaped end girder. At the middle of the end girder are joints witch are fastened with bolts for fragmented transportation of bridge. The platform is used to place trolley traveling mechanism, electric equipment and used for repair.
It has three operation modes: ground handle, wireless remote control and cab. There are two kinds of two cab: open cab and closed cab, where there are adjustable seat, insulating mat on the floor,toughened glass for the window, fire extinguisher, electric fan and auxiliary equipment such as air conditioner,acoustic alarm and interphone which can be furnished as required by users.
The crane can be furnished with load handling devices such as motor grab, electromagnetic chuck to meet the requirement types of materials.
The crane, of a classification group of A3-A7, has a commonly used lifting load 3-250t, so that it is suitable to work in factories, warehouses and freight yards where the ambient temperature is -10-40 degrees centigrade and the relative humidity is not more than 85%. It is prohibited to work in the environment with inflammable, explosive and corrosive gas.
QD typr hanger bridge crane mainly consists of bridge, trolley travelling mechanism, crab and electrical appliances, and is divided into 2 working grades of A5 and A6 according to the use frequency.
This crane operation is complete in driver's chamber.
Double girder overhead crane of Specifications : Lifting Capacity : from 5 T to 400t Span: 4.5m to 45m Lift height: 3m to 60 m Working duty: A3(M3), A4(M4),A5(M5), A6(M6), A7(M7). CE, TUV, GOST certificate, Top quality
Double girder overhead crane of Common working conditions:
1. Working temperature: -25-+45 degree
2. Work moisture: <85%
3. Flammable,explosive and corrosive gas are forbidden in the work environment, there will be special used crane for these environment.
Double girder overhead crane of Features & advantages: ·
1. Reasonable structure, light dead weight ·
2. Favorable performance, accurate and smooth lifting. ·
3. Safe and reliable traveling ·
4. Low noise, easy operation, ·
5. Convenient maintenance, high exchange ability for parts and components ·
6. Main girder: box-shaped girder .
Double girder overhead crane of Common configuration:
1.control methods: Pendant control or remote control cabin control, Or Driver's room.
2. drive units: motor+gear box+brake
3. trolley has hoist type trolley and winch type trolley.
4. Shrouded DSL system for trolley power feeding
6. Electric control box: standard is CHINT electric, Schneider-electric is for choose .
Paper factory specifical crane is according to paper mill
Products:
environment and the using requirements, and for paper mill to develop a dedicated crane, Its lifting structure is different with general double beam crane
environment and the using requirements, and for paper mill to develop a dedicated crane, Its lifting structure is different with general double beam crane, used dedicated spreader , the lifting structure is double trolley, and three trolley or a double hook trolley, a single hook trolley, in the using process , to guarantee crane, and trolley synchronization, can achieved linkage, crane and trolley traveling and the lifting structure adopt frequency adjustable speed, through PLC achieved the institutions of synchronization coordination work, high automation degree.
In order to sending you right price , Please imform us your detailed needs for overhead crane .
1. What is the overhead rated load capacity ?
2. What is the overhead crane span ?
3. What is the overhead lifting height ?
4. the working voltage ?
5. Do you need crane rail and bus bar ?
6. How many hours the crane working per day ?
7. the crane working environment ?
8. any other demands for crane ?