Customization: | Available |
---|---|
After-sales Service: | Solution Within 12 Hours |
Warranty: | 1 Year |
Suppliers with verified business licenses
Hydraulic Gantries are a safe, efficient way to lift and position heavy loads in applications where traditional cranes will not fit and permanent overhead structures are not an option.
Hydraulic Gantries are placed on skid tracks to provide a means for moving and placing heavy loads, many times with only one pick.
One of the standout features of the Intelli-Lift system is its ability to enable remote operation by trained technicians. This functionality allows for precise control over individual towers or synchronized operation of multiple towers, enhancing efficiency and safety on the job site. Additionally, the system offers load readings, operating height monitoring, overload alarms, and synchronized lifting and lowering capabilities.
Lifting Capacity(ton) | 50-1500 ton |
Span(m) | Up to 15m |
Lifting height(m) | Up to 12m |
Power Supply | 380V,50HZ,3-Phase or Customized |
Work Class | A5 |
Motor Brand | ABB/SIEMENS |
Working Temperature | -25~40°C |
1. What certificates can your factory provide?
We have CE and ISO certificates. If you need special certificates such as special CO(certificate of origin), please let me know in advance. We need to verify the manufacturing cost of the certificates.
2. What kind of documents will be delivered together with the crane?
In general,there will be instruction manual,product certificate,technical specifications table,factory inspection report,and crane general drawing,etc.
3. How to ensure that the purchased crane can reach my factory safely and put into production smoothly?
1) The most important thing for a company's long-term development is its reputation. Our factory has a history of 30 years, which is enough to witness our excellent reputation;
2) We have perfect production process control system, storage system, packaging system, QC system and pre shipment inspection system;
3) After the crane arrive at the site, we will send an engineer to guide the installation. After the installation, we will train the operators until they can operate the crane normally;